Thank you. Knowing that GP can make the following connections if it is provided sufficient information is good to know. Further explanation can be illustrated in the example below; Current UOM Schedule: X Base UOM: box Case024 = 24 box New UOM Schedule : New X Base UOM: box Case06 = 6 Box Case024 = 24 box The modification in the example above is correct and will result with no errors since changes have been well applied considering the historical transactions.
↧